跳到内容
洞察

SPCC计划为期五年更新和技术修正案

by 雷竞技好Newbee赞助商braun Intertec |2016年7月29日

The Environmental Protection Agency’s (EPA’s) Spill Prevention, Control, and Countermeasure (SPCC) regulations (Title 40 of the Code of Federal Regulations [CFR] Chapter 112) applies to non-transportation-related facilities that drill, produce, store, process, refine, transfer, distribute, use, or consume oil or oil products; and that could reasonably be expected to discharge oil in harmful quantities (as described in 40 CFR 112.1(b)) to U.S. navigable waters or adjoining shorelines. Facilities subject to this rule are required to prepare and implement a SPCC Plan. The SPCC Plan must contain minimum design criteria and inspection procedures and must be approved by the facility management and certified by a professional engineer (P.E.), unless the total capacity of oil at the facility is less than 10,000 gallons, and the facility meets the criteria of a qualified facility under 40 CFR 112.3(g).

不包括农场的所有设施(在40 cfr 112.2定义)需要更新,准备和实施他们的SPCC计划,以满足这些要求,以满足这些要求,以满足这些要求,以至于,如果设施是陆上生产设施,它变得越来越开业2011年11月10日,该设施应在开始运营后6个月内编写和实施SPCC计划。

基于此,2011年11月10日,准备或更新了SPCC计划符合EPA对SPCC规则的修正案的设施,正在提升五年的审查和评估。这些SPCC计划必须在2016年11月10日之前更新,并通过P.E进行重新认证。如果SPCC计划有技术修正案。技术修正案包括但不限于设施设计,建筑,运营或维护的材料变化,改变油泄漏的潜力。

请联系Emile C. Hanna(P.E.)如果您需要对SPCC计划的任何帮助,并协助您在40 CFR 112下保持遵守EPA规则。

联系我们

    本网站需要cookie提供其所有功能。有关Cookie中包含的数据的更多信息,请参阅我们的隐私政策页。通过继续使用本网站,您同意我们的隐私政策。