Braun Intertec has worked on a wide range of projects at a secondary lead smelter in North Texas (hazardous waste Transfer, Storage and Disposal facility). Our work has included Phase II investigations; remediation of impacted soil; soil sampling to evaluate air monitoring impacts; development of stormwater pollution prevention plans (SWPPPs) and annual updates; spill prevention, control and countermeasure (SPCC) plan development; source reduction/waste minimization (SR/WM) plan; assistance with their environmental management system (EMS) plan; completion of their Texas pollutant discharge elimination system (TPDES) permit and design and contractor oversight of landfill cell construction.
Client
Battery Recycler/Refiner