Client North Dakota Department of Transportation
Braun Branded Graphic

For the construction of the Four Bears Bridge, a 4,500-foot-long, segmental concrete structure that crosses Lake Sakakawea in the northwestern corner of the Fort Berthold Reservation, we were retained to provide construction engineering and testing, including dynamic pile analysis for piles with design capacities up to 400 tons.

Challenges on the $45 million project included performing soil borings on the lake from a barge while advancing through 60 feet of water and 240 feet of soil. Because it was November, when the weather can be unpredictable, drilling continued 24 hours a day, six days a week, for three weeks. Test methods included standard penetration testing, flat-plate dilatometer testing and cone penetration testing. Our engineering analysis included a number of pile and drilled pier foundation solutions, with the selected system being a concrete-filled, driven steel-shell pile, 36 inches in diameter.

Contact Us

    This website requires cookies to provide all of its features. For more information on what data is contained in the cookies, please see ourPrivacy Policy页面。通过继续使用该网站, you agree to our Privacy Policy.